Sign In | Join Free | My portofva.com |
|
Brand Name : KXD
Model Number : S-0047
Certification : CE, ISO, SGS
Place of Origin : Qingdao, China
MOQ : 500 square meters
Price : US$ 50-80 per square meter
Payment Terms : L/C,T/T
Supply Ability : 3000 tons per month
Delivery Time : 30-40 working days
Packaging Details : bulk for steel panels, steel pallet for steel structure, wooden box for small installing accessories
Dimensions : Customers' Requirement
Door : Sliding door or rolling door
Color : Client's Request
Visit : Workshop Visit And Check Available
Surface : Hot-dip Galvanized / Painted
Frame : Steel structure
Lifetime : over 50 years
Structure Type : High Strength Steel Structure Frame
Model No : KXD-SSB130
Prefabrication : Off-site
Installation : Fast
Your Building details confirm to get the design & quotation:
Size | Length × Width × Length |
Building Application | its exact usage or special requirements |
Roof & Wall material | Steel sheet ? Insulated Panel ? Decorative Panel? |
Crane | yes or not? Ton? |
Wind Load | wind speed km/h or m/s or mph? |
Snow Load | snow weight kg/m2 or snow thickness or Kn/m2? |
Door & Window | Sizes? Quantity? Layout? |
Inner Layout | Partition room? |
More options | Parapet? Skylight? Ventilation? Canopy? Glass wall curtain? |
Processing Steps of Prefabricated Steel Structure Buildings:
Planning and Design
Prefabricated steel buildings starts with a detailed planning and design phase. During this stage, the project’s requirements are identified, and the building’s specifications are established. Factors such as size, layout, and intended usage are considered to ensure that the final design meets the client’s needs. The planning phase also includes obtaining necessary permits and approvals, as local regulations may impact the building’s design.
Fabrication in the workshop
Once the design is finalized, the components are manufactured in a factory. The use of advanced technology in the manufacturing process ensures that the components are of high quality and precisely engineered for quick assembly.
On-Site Assembly
After the prefabricated components are transported to the site, the assembly process begins. Since the parts are pre-engineered, they fit together seamlessly, making the installation process much faster than traditional construction methods. A skilled team of workers assembles the steel frame, attaches the wall panels, and installs the roofing system. Depending on the size and complexity of the building, the assembly process can take anywhere from a few days to a few weeks.
KXD Company Service:
Certification Service
We support third-party factory inspections and quality verification, like SGS, BV, ITS. Till now, we have made various certifications to meet different regions policy. There are SGS, ISO, CE, EN1090, EXC etc.
Workshop Visit and Product Check Service
You are warmly welcome to visit our production lines before the order, your project processing during the production and finished steel components in the packing and loading.
Flexible Payment
Different payment terms like T/T, LC, with FOB, CIF, CFR on options.
Design Service
For products, we accept the production exactly same as your own drawing details. Different standards or the equivalent exchange are both acceptable.
If you have only ideas, we could offer free architectural design and production for you.
Production Service
All raw materials are purchased from qualified mills and the materials quality should be checked when received.
Quality control will be done in each production progress to guarantee every steel component quality. And each component will packed and protected before the shipment.
Installation Support
We offer free assemble guide and solve any technical questions in the installing time.
If the client has the demands, we could also send our engineer to guide or send our installing team to install on site. Different plans are for clients' option.
Welcome to Contact further!
![]() |
1-3 Floors Office Steel Warehouse Prefab Steel Structure Frame Mix Use Building Images |